Triple

T12298354
Position Surface form Disambiguated ID Type / Status
Subject Abuja master plan E293149 entity
Predicate instanceOf P0 FINISHED
Object city development blueprint C15908 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: city development blueprint
Context triple: [Abuja master plan, instanceOf, city development blueprint]
  • A. town plan chosen
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. urban development
    Urban development is the planned growth and improvement of cities and towns through the design, regulation, and construction of buildings, infrastructure, and public spaces to support economic, social, and environmental needs.
  • D. city planner
    A city planner is a professional who designs, organizes, and regulates the use of urban space to balance social, economic, environmental, and infrastructural needs for sustainable community development.
  • E. landmark planning blueprint
    A landmark planning blueprint is a strategic, visual, and documented plan that outlines the design, placement, significance, and long-term development of key landmarks within a geographic or urban context.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab690ad081908c0ed3870ec82d53 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:52 p.m.