Triple

T12293401
Position Surface form Disambiguated ID Type / Status
Subject Washington State Route 26 E293021 entity
Predicate connectsTo P845 FINISHED
Object State Route 21 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Route 21 | Statement: [Washington State Route 26, connectsTo, State Route 21]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: State Route 21
Context triple: [Washington State Route 26, connectsTo, State Route 21]
  • A. State Route 21 chosen
    State Route 21 is a state highway in Washington that runs through rural areas including Lincoln County, connecting small communities and serving as a regional transportation corridor.
  • B. State Route 21
    State Route 21 is a primary north–south state highway in Alabama that connects several major towns and communities across the state.
  • C. State Route 21
    State Route 21 is a major north–south highway in northeastern Ohio that serves as a key connector through cities such as Massillon.
  • D. State Route 19
    State Route 19 is a major north–south state highway in Southern California that connects several cities in Los Angeles and Orange counties.
  • E. State Route 210
    State Route 210 is a major east–west freeway in Southern California that serves as part of the Foothill Freeway corridor, connecting cities across the Inland Empire and the greater Los Angeles area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab690ad081908c0ed3870ec82d53 completed April 8, 2026, 7:24 p.m.
NER Named-entity recognition batch_69d91d23def88190adbaa282dd03d6c6 completed April 10, 2026, 3:54 p.m.
Created at: April 8, 2026, 9:52 p.m.