Triple

T12282579
Position Surface form Disambiguated ID Type / Status
Subject Box Shield E292749 entity
Predicate instanceOf P0 FINISHED
Object compliance solution C13165 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: compliance solution
Context triple: [Box Shield, instanceOf, compliance solution]
  • A. compliance platform chosen
    A compliance platform is an integrated system that centralizes, automates, and monitors an organization’s policies, controls, and regulatory obligations to ensure ongoing adherence to internal and external requirements.
  • B. tax compliance solution
    A tax compliance solution is a system that automates the calculation, reporting, and filing of taxes to ensure organizations meet all regulatory requirements accurately and on time.
  • C. compliance committee
    A compliance committee is a designated group within an organization responsible for overseeing, monitoring, and guiding adherence to legal, regulatory, and internal policy requirements.
  • D. conformity assessment scheme
    A conformity assessment scheme is a structured, predefined set of rules, procedures, and criteria used to systematically evaluate and determine whether products, services, systems, or persons meet specified standards or regulatory requirements.
  • E. disaster recovery solution
    A disaster recovery solution is a comprehensive system of tools, processes, and policies designed to quickly restore critical IT services and data after disruptive events, minimizing downtime and business impact.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab690ad081908c0ed3870ec82d53 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:52 p.m.