Triple
T12282578
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Box Shield |
E292749
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | data protection solution |
C31230
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: data protection solution Context triple: [Box Shield, instanceOf, data protection solution]
-
A.
disaster recovery solution
A disaster recovery solution is a comprehensive system of tools, processes, and policies designed to quickly restore critical IT services and data after disruptive events, minimizing downtime and business impact.
-
B.
data center management solution
A data center management solution is a comprehensive software platform that monitors, controls, and optimizes the physical and virtual resources, infrastructure, and operations within a data center to ensure efficiency, reliability, and scalability.
-
C.
master data management solution
A master data management solution is a centralized platform that defines, consolidates, and governs an organization’s core data entities to ensure consistency, accuracy, and reliability across all systems and business processes.
-
D.
secure storage facility
A secure storage facility is a highly protected, access-controlled environment designed to safely store valuable, sensitive, or hazardous items against theft, damage, and unauthorized access.
-
E.
security management service
A security management service is a system or organization that plans, implements, monitors, and continuously improves measures to protect an entity’s assets, information, and operations from security threats and vulnerabilities.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab690ad081908c0ed3870ec82d53 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:52 p.m.