Triple

T12270112
Position Surface form Disambiguated ID Type / Status
Subject New Gilded Age E292448 entity
Predicate instanceOf P0 FINISHED
Object socioeconomic period C138 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: socioeconomic period
Context triple: [New Gilded Age, instanceOf, socioeconomic period]
  • A. historical period chosen
    A historical period is a span of time characterized by distinct social, political, cultural, or technological conditions that differentiate it from other eras in history.
  • B. historical periodization system
    A historical periodization system is a conceptual framework that divides the past into distinct, named eras or periods to organize and interpret historical events and developments.
  • C. socio-economic study
    A socio-economic study is a systematic analysis of how social factors and economic conditions interact to influence individuals, communities, and broader societal outcomes.
  • D. historical city period
    A historical city period is a span of time in a city's past characterized by distinctive social, political, economic, and cultural conditions that shape its development and identity.
  • E. socio-economic theory
    Socio-economic theory is a conceptual framework that analyzes how economic activity, social structures, and power relations interact to shape the distribution of resources, opportunities, and outcomes in society.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab6856488190b5d31178d5015f8e completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:52 p.m.