Triple
T12266649
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MOLLE |
E292363
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | load-bearing equipment system |
C31187
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: load-bearing equipment system Context triple: [MOLLE, instanceOf, load-bearing equipment system]
-
A.
gantry crane
A gantry crane is a type of overhead crane that straddles its workspace on legs or supports, moving along rails or wheels to lift and transport heavy loads.
-
B.
cable car system
A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
-
C.
cantilever crane
A cantilever crane is a lifting device with a horizontal beam fixed at one end and projecting outward to support loads without additional vertical support at the free end.
-
D.
straddle-beam monorail
A straddle-beam monorail is a transit system in which rubber-tired vehicles ride astride a single elevated concrete or steel beam, using it for both support and guidance.
-
E.
storage and distribution system
A storage and distribution system is an integrated arrangement of facilities, equipment, and processes designed to efficiently receive, store, manage, and deliver goods or resources to their intended destinations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6856488190b5d31178d5015f8e |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:52 p.m.