Triple
T12264399
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Johns Island |
E292305
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | island in South Carolina |
C445
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: island in South Carolina Context triple: [Johns Island, instanceOf, island in South Carolina]
-
A.
island state
An island state is a sovereign political entity whose territory consists primarily of one or more islands, geographically separated from continental landmasses by surrounding bodies of water.
-
B.
town in North Carolina
A town in North Carolina is a municipally incorporated community within the state that provides local governance, services, and regulations for its residents under North Carolina law.
-
C.
South Carolina family
A South Carolina family is a household unit whose members are connected by blood, marriage, or adoption and who live in or maintain strong social, cultural, and economic ties to the state of South Carolina.
-
D.
island
chosen
An island is a landmass completely surrounded by water, smaller than a continent and isolated from other substantial land areas.
-
E.
coastal state
A coastal state is a nation or subnational entity whose territory includes a shoreline along an ocean or sea, granting it specific maritime rights and responsibilities under international law.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6856488190b5d31178d5015f8e |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:52 p.m.