Triple
T12262299
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Coney Island Funnyland |
E292253
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | heritage amusement ride |
C8768
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: heritage amusement ride Context triple: [Coney Island Funnyland, instanceOf, heritage amusement ride]
-
A.
amusement park attraction
chosen
An amusement park attraction is a designed entertainment feature or ride that provides guests with thrilling, enjoyable, or immersive experiences within a themed recreational setting.
-
B.
theme park attraction vehicle
A theme park attraction vehicle is a specially designed conveyance that transports guests through a ride experience, integrating safety systems, thematic elements, and motion to support the attraction’s narrative and sensory effects.
-
C.
themed entertainment attraction
A themed entertainment attraction is an immersive, story-driven experience that combines environment design, technology, and performance to engage guests in a specific narrative or world.
-
D.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
-
E.
carousel-style ride
A carousel-style ride is an amusement attraction featuring a rotating circular platform with seats, often shaped like animals or vehicles, that move up and down as the ride spins.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab6856488190b5d31178d5015f8e |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:52 p.m.