Triple

T12246443
Position Surface form Disambiguated ID Type / Status
Subject Principles of Corporate Governance E291863 entity
Predicate instanceOf P0 FINISHED
Object restatement-like project C31157 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: restatement-like project
Context triple: [Principles of Corporate Governance, instanceOf, restatement-like project]
  • A. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • B. studio project
    A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
  • C. collaborative project
    A collaborative project is a coordinated effort in which multiple individuals or groups work together, sharing responsibilities, resources, and expertise to achieve a common goal.
  • D. project
    A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
  • E. nonprofit project
    A nonprofit project is a coordinated set of activities and resources organized to achieve a specific social, cultural, or environmental mission without the primary goal of generating profit.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab67950c8190be08450a06228c4b completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:51 p.m.