Triple

T1224517
Position Surface form Disambiguated ID Type / Status
Subject Interstate 65 E26295 entity
Predicate majorJunctionWith P1018 FINISHED
Object Interstate 74 E65462 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 74 | Statement: [Interstate 65, majorJunctionWith, Interstate 74]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 74
Context triple: [Interstate 65, majorJunctionWith, Interstate 74]
  • A. Interstate 74 chosen
    Interstate 74 is a major east–west U.S. Interstate Highway that runs through multiple Midwestern and Southeastern states, including a segment in North Carolina.
  • B. Interstate 88
    Interstate 88 is a major east–west highway in Illinois that connects the Chicago metropolitan area with the Quad Cities and serves as a key regional transportation corridor.
  • C. Interstate 94
    Interstate 94 is a major east–west U.S. Interstate Highway running from Montana to Michigan, serving key Midwestern cities such as Minneapolis–Saint Paul, Milwaukee, and Chicago.
  • D. Interstate 57
    Interstate 57 is a major north–south U.S. Interstate Highway running from Chicago, Illinois, to Sikeston, Missouri, serving as a key route through the central United States.
  • E. Interstate 430
    Interstate 430 is a bypass freeway in the Little Rock, Arkansas metropolitan area that connects Interstate 30 with Interstate 40 and helps route traffic around the city.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a49484688c8190a1bf285eb396a8b6 completed March 1, 2026, 7:33 p.m.
NER Named-entity recognition batch_69a4bf169868819090cfab7e34c40c67 completed March 1, 2026, 10:35 p.m.
NED1 Entity disambiguation (via context triple) batch_69c140fc97f48190aa77fb32ccd658ab completed March 23, 2026, 1:32 p.m.
Created at: March 1, 2026, 7:47 p.m.