Triple

T12230692
Position Surface form Disambiguated ID Type / Status
Subject Yosemite National Park maintenance facilities E291468 entity
Predicate instanceOf P0 FINISHED
Object park operations infrastructure C31132 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: park operations infrastructure
Context triple: [Yosemite National Park maintenance facilities, instanceOf, park operations infrastructure]
  • A. park operating entity
    A park operating entity is an organization or authority responsible for managing, maintaining, and overseeing the daily operations, services, and regulations of a park or system of parks.
  • B. park system
    A park system is an organized network of public parks and green spaces managed collectively to provide recreation, conservation, and aesthetic benefits to a community or region.
  • C. park complex
    A park complex is a large, planned outdoor area that combines multiple recreational, natural, and community facilities—such as playgrounds, sports fields, gardens, and walking paths—into a unified public space.
  • D. park feature
    A park feature is any designed or natural element within a park—such as paths, benches, playgrounds, gardens, or water bodies—that contributes to its use, aesthetics, or ecological value.
  • E. park district
    A park district is a local governmental or administrative entity responsible for planning, developing, maintaining, and operating public parks, recreational facilities, and related community programs within a defined geographic area.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab668acc8190963ba424049d6aee completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:51 p.m.