Triple

T12230691
Position Surface form Disambiguated ID Type / Status
Subject Yosemite National Park maintenance facilities E291468 entity
Predicate instanceOf P0 FINISHED
Object maintenance facility complex C4156 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maintenance facility complex
Context triple: [Yosemite National Park maintenance facilities, instanceOf, maintenance facility complex]
  • A. maintenance facility chosen
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • B. multi-purpose facility
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • C. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • D. facility
    A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
  • E. maintenance agency
    A maintenance agency is an organization that provides ongoing repair, upkeep, and facility management services for buildings, equipment, or infrastructure on behalf of clients.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab668acc8190963ba424049d6aee completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:51 p.m.