Triple

T12204848
Position Surface form Disambiguated ID Type / Status
Subject All-purpose Lightweight Individual Carrying Equipment E290809 entity
Predicate wasLaterSupplementedBy P55853 FINISHED
Object All-purpose Lightweight Individual Carrying Equipment, Enhanced E290809 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: All-purpose Lightweight Individual Carrying Equipment, Enhanced | Statement: [All-purpose Lightweight Individual Carrying Equipment, wasLaterSupplementedBy, All-purpose Lightweight Individual Carrying Equipment, Enhanced]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: All-purpose Lightweight Individual Carrying Equipment, Enhanced
Context triple: [All-purpose Lightweight Individual Carrying Equipment, wasLaterSupplementedBy, All-purpose Lightweight Individual Carrying Equipment, Enhanced]
  • A. All-purpose Lightweight Individual Carrying Equipment chosen
    All-purpose Lightweight Individual Carrying Equipment (ALICE) is a U.S. military load-bearing gear system introduced in the 1970s that uses belts, suspenders, and rucksacks to carry soldiers’ equipment.
  • B. Modular Lightweight Load-carrying Equipment
    Modular Lightweight Load-carrying Equipment (MOLLE) is a U.S. military tactical gear system that uses a webbing-based design to attach and customize pouches and equipment on load-bearing vests and packs.
  • C. Integrated Cargo Carrier – Vertical Light Deployable
    The Integrated Cargo Carrier – Vertical Light Deployable (ICC-VLD) is an external logistics platform used on Space Shuttle missions to transport and temporarily store unpressurized cargo and hardware for the International Space Station.
  • D. Personnel Armor System for Ground Troops
    Personnel Armor System for Ground Troops was a U.S. military body armor system used by ground forces before being superseded by more advanced protective gear.
  • E. Modular Tactical Vest
    The Modular Tactical Vest is a U.S. military body armor system designed to improve protection, modularity, and load-carrying capability for soldiers in combat.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: wasLaterSupplementedBy
Context triple: [All-purpose Lightweight Individual Carrying Equipment, wasLaterSupplementedBy, All-purpose Lightweight Individual Carrying Equipment, Enhanced]
  • A. wasSupersededBy
    Indicates that one entity has been replaced or made obsolete by another entity that takes over its role or function.
  • B. laterComplementedBy chosen
    Indicates that an earlier entity is subsequently supplemented, enhanced, or completed by a later entity.
  • C. furtherAmendedBy
    Indicates that an existing item (such as a document, law, or agreement) is modified again by a subsequent amendment, building on prior changes.
  • D. wasExtendedTo
    Indicates that something previously existing was lengthened, expanded, or prolonged to reach a new limit, scope, or duration.
  • E. laterIncludedOn
    Indicates that one entity was added to, incorporated into, or featured on another entity at a subsequent time.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab65923081909acfc61b7a612233 completed April 8, 2026, 7:24 p.m.
NER Named-entity recognition batch_69d938cd2edc8190b1971349dbc0dee0 completed April 10, 2026, 5:52 p.m.
NED1 Entity disambiguation (via context triple) batch_69f60a9ae3d48190a220ccd37ce8d3e7 completed May 2, 2026, 2:30 p.m.
PD Predicate disambiguation batch_69d91c38321c819080d500d0d64a04f6 completed April 10, 2026, 3:50 p.m.
Created at: April 8, 2026, 9:51 p.m.