Triple

T12202923
Position Surface form Disambiguated ID Type / Status
Subject Iron Dome E290760 entity
Predicate reportedInterceptionSuccessRate_percent P7192 FINISHED
Object over 80 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: over 80 | Statement: [Iron Dome, reportedInterceptionSuccessRate_percent, over 80]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reportedInterceptionSuccessRate_percent
Context triple: [Iron Dome, reportedInterceptionSuccessRate_percent, over 80]
  • A. successRate chosen
    Indicates the proportion or frequency with which attempts at a given action or process result in a successful outcome.
  • B. interceptionTimeRemaining
    Indicates the amount of time left before an interception event between entities is expected to occur.
  • C. terminationRate
    Indicates the frequency or proportion at which something (such as a process, contract, or relationship) is ended or discontinued over a given context or time period.
  • D. interceptions
    Indicates that one entity successfully stops, seizes, or cuts off another entity or action in progress, preventing it from reaching its intended target or outcome.
  • E. successMetric
    Indicates the specific criterion or measure used to evaluate whether an action, process, or relationship has achieved its intended success.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab65923081909acfc61b7a612233 completed April 8, 2026, 7:24 p.m.
NER Named-entity recognition batch_69d938cd2edc8190b1971349dbc0dee0 completed April 10, 2026, 5:52 p.m.
PD Predicate disambiguation batch_69d91c38321c819080d500d0d64a04f6 completed April 10, 2026, 3:50 p.m.
Created at: April 8, 2026, 9:51 p.m.