Triple

T12193970
Position Surface form Disambiguated ID Type / Status
Subject Hall of Remembrance (unrealized) E290537 entity
Predicate instanceOf P0 FINISHED
Object unrealized memorial project C23919 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: unrealized memorial project
Context triple: [Hall of Remembrance (unrealized), instanceOf, unrealized memorial project]
  • A. commemorative project chosen
    A commemorative project is an organized effort to honor, remember, or celebrate a person, group, event, or idea through lasting or symbolic actions, artifacts, or experiences.
  • B. unbuilt aircraft project
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • C. planned national memorial
    A planned national memorial is a formally proposed and authorized monument or site, not yet completed, intended to commemorate a person, group, event, or idea of enduring national significance.
  • D. unreleased operating system project
    An unreleased operating system project is a not-yet-public software platform under development that manages hardware resources and provides core services for running applications.
  • E. unfinished fort
    An unfinished fort is a partially constructed defensive structure, typically consisting of incomplete walls, foundations, or earthworks, that was abandoned before reaching its intended military or protective capacity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab64de5881908d56eb7a75c6cc69 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:50 p.m.