Triple

T12190053
Position Surface form Disambiguated ID Type / Status
Subject Magrathean workshops E290437 entity
Predicate instanceOf P0 FINISHED
Object planet-construction facility C31057 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planet-construction facility
Context triple: [Magrathean workshops, instanceOf, planet-construction facility]
  • A. hypothetical megastructure concept
    A hypothetical megastructure concept is an immense, often star- or system-spanning engineered construct envisioned to harness, manage, or transform vast amounts of energy, matter, or space on a civilizational scale.
  • B. surface station
    A surface station is a ground-based facility equipped with instruments and systems to monitor, control, or communicate with external environments or assets such as weather, spacecraft, or remote sensors.
  • C. planet
    A planet is a large, roughly spherical celestial body that orbits a star, has sufficient mass for its gravity to maintain hydrostatic equilibrium, and has cleared its orbital neighborhood of other debris.
  • D. space launch facility
    A space launch facility is a specialized complex equipped with infrastructure, systems, and support services for preparing, launching, and sometimes recovering spacecraft and launch vehicles.
  • E. planetarium building
    A planetarium building is a specialized structure designed to simulate the night sky and celestial phenomena for education, research, and public entertainment using projection and astronomical displays.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab64de5881908d56eb7a75c6cc69 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:50 p.m.