Triple

T12188778
Position Surface form Disambiguated ID Type / Status
Subject Cactus Dome E290405 entity
Predicate instanceOf P0 FINISHED
Object nuclear waste containment structure C16066 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: nuclear waste containment structure
Context triple: [Cactus Dome, instanceOf, nuclear waste containment structure]
  • A. high-level radioactive waste storage facility chosen
    A high-level radioactive waste storage facility is a secure, engineered site designed to safely contain and isolate highly radioactive materials from the environment and human populations for extended periods of time.
  • B. radioactive waste processing facility
    A radioactive waste processing facility is a specialized industrial installation that receives, treats, conditions, and packages radioactive materials to reduce their hazard and prepare them for safe transport, storage, or disposal in compliance with strict regulatory and environmental standards.
  • C. nuclear materials handling facility
    A nuclear materials handling facility is a specialized, highly regulated industrial site designed for the safe receipt, storage, processing, and transfer of radioactive materials while protecting workers, the public, and the environment.
  • D. nuclear reactor
    A nuclear reactor is a controlled system that initiates, sustains, and regulates a nuclear fission chain reaction to produce heat, typically for generating electricity or powering ships.
  • E. nuclear weapons assembly plant
    A nuclear weapons assembly plant is a highly secure industrial facility where nuclear and non-nuclear components are manufactured, integrated, and tested to produce complete nuclear weapons in compliance with strict safety, security, and regulatory standards.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab64de5881908d56eb7a75c6cc69 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:50 p.m.