Triple
T12188444
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Operation Sandstone |
E290398
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | series of nuclear weapons tests |
C1431
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: series of nuclear weapons tests Context triple: [Operation Sandstone, instanceOf, series of nuclear weapons tests]
-
A.
nuclear weapons test series
chosen
A nuclear weapons test series is an organized sequence of nuclear detonations conducted under a unified program or objective to develop, evaluate, or demonstrate nuclear weapon capabilities.
-
B.
nuclear test
A nuclear test is an experimental detonation or controlled release of nuclear energy conducted to develop, evaluate, or demonstrate the performance and effects of nuclear weapons or technology.
-
C.
atomic bomb test
An atomic bomb test is a controlled detonation of a nuclear device conducted to evaluate its design, yield, and effects for military, scientific, or political purposes.
-
D.
nuclear weapons program
A nuclear weapons program is an organized, often state-led effort to research, develop, test, produce, and maintain nuclear warheads and their delivery systems for military deterrence or potential use.
-
E.
nuclear weapon
A nuclear weapon is a highly destructive explosive device that releases immense energy through nuclear fission, fusion, or a combination of both, causing catastrophic blast, heat, and radiation effects.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab64de5881908d56eb7a75c6cc69 |
completed | April 8, 2026, 7:24 p.m. |
Created at: April 8, 2026, 9:50 p.m.