Triple

T12188292
Position Surface form Disambiguated ID Type / Status
Subject Carl & Cole E290393 entity
Predicate instanceOf P0 FINISHED
Object San Francisco Muni stop C2851 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: San Francisco Muni stop
Context triple: [Carl & Cole, instanceOf, San Francisco Muni stop]
  • A. West Coast Express station
    A West Coast Express station is a designated passenger rail facility along the West Coast Express commuter line that provides boarding, alighting, and related services for regional train travelers.
  • B. San Francisco Muni service application
    A San Francisco Muni service application is a mobile or web-based system that provides real-time transit information, trip planning, service alerts, and fare-related features for riders using San Francisco’s Muni public transportation network.
  • C. AC Transit division
    An AC Transit division is a geographically defined operational facility where the Alameda-Contra Costa Transit District houses, maintains, and dispatches its bus fleet and personnel for service in a specific service area.
  • D. light-rail station chosen
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • E. MARTA rail station
    A MARTA rail station is a designated facility along the Metropolitan Atlanta Rapid Transit Authority’s rail network where passengers access, board, and transfer between trains and related transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab64de5881908d56eb7a75c6cc69 completed April 8, 2026, 7:24 p.m.
Created at: April 8, 2026, 9:50 p.m.