Triple

T12169966
Position Surface form Disambiguated ID Type / Status
Subject General Services Building E289933 entity
Predicate instanceOf P0 FINISHED
Object operations facility C19689 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: operations facility
Context triple: [General Services Building, instanceOf, operations facility]
  • A. production facility
    A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
  • B. facility chosen
    A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
  • C. maintenance facility
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • D. infrastructure facility
    An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
  • E. network operations facility
    A network operations facility is a centralized, secure environment where personnel and systems monitor, manage, and maintain an organization’s communication networks and related infrastructure to ensure reliable, efficient, and secure operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4d6c00819095a9a7c35de83cfb completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:50 p.m.