Triple
T12163953
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Karuma Hydropower Station |
E289780
|
entity |
| Predicate | regulator |
P46
|
FINISHED |
| Object | Electricity Regulatory Authority of Uganda |
E746124
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Electricity Regulatory Authority of Uganda | Statement: [Karuma Hydropower Station, regulator, Electricity Regulatory Authority of Uganda]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Electricity Regulatory Authority of Uganda Context triple: [Karuma Hydropower Station, regulator, Electricity Regulatory Authority of Uganda]
-
A.
Electricity Regulatory Authority (Uganda)
chosen
The Electricity Regulatory Authority (Uganda) is the national body responsible for licensing, regulating, and overseeing Uganda’s electricity generation, transmission, distribution, and sale to ensure reliable and fairly priced power.
-
B.
Uganda Electricity Distribution Company Limited
Uganda Electricity Distribution Company Limited is a Ugandan state-linked utility responsible for managing and operating the country’s electricity distribution network.
-
C.
Uganda Electricity Transmission Company Limited
Uganda Electricity Transmission Company Limited is Uganda’s state-owned utility responsible for operating, maintaining, and developing the national high-voltage electricity transmission grid.
-
D.
Uganda Electricity Generation Company Limited
Uganda Electricity Generation Company Limited is a state-owned utility responsible for developing, operating, and maintaining electricity generation facilities in Uganda.
-
E.
Eskom Uganda Limited
Eskom Uganda Limited is an energy company responsible for operating and maintaining major hydroelectric power facilities in Uganda.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4d6c00819095a9a7c35de83cfb |
completed | April 8, 2026, 7:23 p.m. |
| NER | Named-entity recognition | batch_69d915c498a081908389598d0c247505 |
completed | April 10, 2026, 3:22 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f5f6a2716081909620a9d11cfcc2d8 |
completed | May 2, 2026, 1:05 p.m. |
Created at: April 8, 2026, 9:50 p.m.