Triple

T12152825
Position Surface form Disambiguated ID Type / Status
Subject Kalpasar project E289499 entity
Predicate feasibilityStudiesBy P103237 FINISHED
Object Central Water Commission of India E543280 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Water Commission of India | Statement: [Kalpasar project, feasibilityStudiesBy, Central Water Commission of India]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Water Commission of India
Context triple: [Kalpasar project, feasibilityStudiesBy, Central Water Commission of India]
  • A. Central Water Commission of India chosen
    The Central Water Commission of India is a premier technical organization under the Government of India responsible for the planning, development, and management of the country’s water resources, particularly in the fields of irrigation, flood control, and hydropower.
  • B. Bhakra Beas Management Board
    The Bhakra Beas Management Board is an Indian governmental organization responsible for managing and operating major multipurpose dam and irrigation projects on the Sutlej and Beas rivers in northern India.
  • C. Narmada Control Authority
    The Narmada Control Authority is a statutory body in India responsible for coordinating and regulating the planning, construction, and operation of inter-state projects on the Narmada River, including major dams and related infrastructure.
  • D. Damodar Valley Corporation
    Damodar Valley Corporation is a government-owned power and irrigation utility in eastern India responsible for multi-purpose development of the Damodar River basin, including electricity generation, flood control, and water management.
  • E. Central Water Engineering Service
    The Central Water Engineering Service is a central government cadre of engineers in India responsible for planning, designing, and managing water resources and related infrastructure projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: feasibilityStudiesBy
Context triple: [Kalpasar project, feasibilityStudiesBy, Central Water Commission of India]
  • A. studiesProcess
    Indicates that an entity systematically examines, researches, or learns about a particular process.
  • B. canBeStudiedAs
    Indicates that something is suitable or appropriate to be examined, analyzed, or researched as a subject of study.
  • C. studiesFor
    Indicates that one entity engages in studying or academic preparation with the purpose of achieving or supporting another entity (such as a goal, exam, or qualification).
  • D. hasResearchStatus
    Indicates that an entity holds a particular stage or condition within a research process, such as planned, in progress, completed, or published.
  • E. coordinatesClinicalTrialsFor
    Indicates that one entity organizes, manages, or oversees the planning and execution of clinical trials on behalf of another entity.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4c6710819097a9d228382dde43 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d915d7109481908bf5fe512bba3c89 completed April 10, 2026, 3:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69f5f69aa2e88190aaa58468571d6dad completed May 2, 2026, 1:05 p.m.
PD Predicate disambiguation batch_69d9150c18148190bf8152189c0e5fca completed April 10, 2026, 3:19 p.m.
PDg Predicate description generation batch_69d915d58ab881908b5b7901990308a4 completed April 10, 2026, 3:23 p.m.
Created at: April 8, 2026, 9:49 p.m.