Triple

T12152799
Position Surface form Disambiguated ID Type / Status
Subject Bharuch district E289498 entity
Predicate hasFamousIndustrialCorridor P103236 FINISHED
Object Delhi–Mumbai Industrial Corridor E379750 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Mumbai Industrial Corridor | Statement: [Bharuch district, hasFamousIndustrialCorridor, Delhi–Mumbai Industrial Corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Delhi–Mumbai Industrial Corridor
Context triple: [Bharuch district, hasFamousIndustrialCorridor, Delhi–Mumbai Industrial Corridor]
  • A. Chennai–Bengaluru Industrial Corridor
    The Chennai–Bengaluru Industrial Corridor is a major infrastructure and economic development project in southern India aimed at boosting manufacturing, logistics, and urban growth between the cities of Chennai and Bengaluru.
  • B. Delhi–Mumbai Industrial Corridor region chosen
    The Delhi–Mumbai Industrial Corridor region is a major planned industrial and infrastructure development zone spanning several Indian states between Delhi and Mumbai, aimed at boosting manufacturing, logistics, and urban growth.
  • C. Delhi–Kolkata rail corridor
    The Delhi–Kolkata rail corridor is one of India’s busiest and most important railway routes, linking the national capital with the eastern metropolis through major northern and eastern cities.
  • D. Delhi–Mumbai Expressway
    The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
  • E. Hyderabad–Warangal industrial corridor
    The Hyderabad–Warangal industrial corridor is a planned economic development zone in Telangana, India, aimed at boosting manufacturing, infrastructure, and regional connectivity between the cities of Hyderabad and Warangal.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasFamousIndustrialCorridor
Context triple: [Bharuch district, hasFamousIndustrialCorridor, Delhi–Mumbai Industrial Corridor]
  • A. isIndustrialCorridor
    Indicates that an area or route is designated and used primarily for industrial activities, facilities, or transportation.
  • B. isIndustrialRegion
    Indicates that a given area functions primarily as a center of industrial activity, characterized by significant manufacturing, production, or related industrial operations.
  • C. hasIndustrialTown
    Indicates that an entity possesses or is associated with a town characterized primarily by industrial activities or facilities.
  • D. partOfIndustrialRegion
    Indicates that an entity is located within or belongs to a broader industrial region or industrially developed area.
  • E. hasIndustrialPark
    Indicates that a location or entity possesses or contains an industrial park within its area or jurisdiction.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4c6710819097a9d228382dde43 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d915d7109481908bf5fe512bba3c89 completed April 10, 2026, 3:23 p.m.
NED1 Entity disambiguation (via context triple) batch_69f5f69aa2e88190aaa58468571d6dad completed May 2, 2026, 1:05 p.m.
PD Predicate disambiguation batch_69d9150c18148190bf8152189c0e5fca completed April 10, 2026, 3:19 p.m.
PDg Predicate description generation batch_69d915d58ab881908b5b7901990308a4 completed April 10, 2026, 3:23 p.m.
Created at: April 8, 2026, 9:49 p.m.