Triple
T12150389
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MacArthur Bridge |
E289436
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge in Manila |
C14406
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge in Manila Context triple: [MacArthur Bridge, instanceOf, bridge in Manila]
-
A.
bridge in the Philippines
chosen
A bridge in the Philippines is a man-made structure that spans physical obstacles such as bodies of water, valleys, or roads within the Philippine archipelago to facilitate transportation and connectivity between different areas.
-
B.
bridge in Thailand
A bridge in Thailand is a structural crossing—ranging from modern cable-stayed spans to traditional concrete or steel structures—designed to connect regions over rivers, roads, or valleys within the Thai landscape and infrastructure network.
-
C.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
-
D.
canal bridge
A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
-
E.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4c6710819097a9d228382dde43 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:49 p.m.