Triple

T12136924
Position Surface form Disambiguated ID Type / Status
Subject Bujagali Hydropower Station E289080 entity
Predicate powerPurchaseAgreementWith P103571 FINISHED
Object Uganda Electricity Transmission Company Limited E746509 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Uganda Electricity Transmission Company Limited | Statement: [Bujagali Hydropower Station, powerPurchaseAgreementWith, Uganda Electricity Transmission Company Limited]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Uganda Electricity Transmission Company Limited
Context triple: [Bujagali Hydropower Station, powerPurchaseAgreementWith, Uganda Electricity Transmission Company Limited]
  • A. Uganda Electricity Transmission Company Limited chosen
    Uganda Electricity Transmission Company Limited is Uganda’s state-owned utility responsible for operating, maintaining, and developing the national high-voltage electricity transmission grid.
  • B. Uganda Electricity Distribution Company Limited
    Uganda Electricity Distribution Company Limited is a Ugandan state-linked utility responsible for managing and operating the country’s electricity distribution network.
  • C. Uganda Electricity Generation Company Limited
    Uganda Electricity Generation Company Limited is a state-owned utility responsible for developing, operating, and maintaining electricity generation facilities in Uganda.
  • D. Eskom Uganda Limited
    Eskom Uganda Limited is an energy company responsible for operating and maintaining major hydroelectric power facilities in Uganda.
  • E. Uganda Railways Corporation
    Uganda Railways Corporation is the state-owned company responsible for operating and managing Uganda’s railway transport network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: powerPurchaseAgreementWith
Context triple: [Bujagali Hydropower Station, powerPurchaseAgreementWith, Uganda Electricity Transmission Company Limited]
  • A. gridConnectionAgreementWith
    Indicates an agreement establishing the terms and conditions under which one party is connected to another party’s electrical grid.
  • B. basedOnAgreementWith
    Indicates that something exists, is done, or is determined on the basis of a prior agreement or accord between the involved parties.
  • C. powerSalesPriority
    Indicates the relative importance or preference assigned to selling power or energy products compared to other sales opportunities.
  • D. negotiatedPursuantTo
    Indicates that a negotiation occurred in accordance with, or as required by, a specific agreement, rule, provision, or legal/contractual framework.
  • E. rightsAgreementSignedWith
    Indicates that a formal rights agreement has been executed and signed between two parties.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4b5e4c81909950b17151eb0951 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d91841615c819097f20a7447a1b8f4 completed April 10, 2026, 3:33 p.m.
NED1 Entity disambiguation (via context triple) batch_69f5f690ae408190966bb4fe8feaa7d2 completed May 2, 2026, 1:05 p.m.
PD Predicate disambiguation batch_69d91508f8008190b3a90ec0bf0953ca completed April 10, 2026, 3:19 p.m.
PDg Predicate description generation batch_69d9183ec1008190b437b7d5e1f52830 completed April 10, 2026, 3:33 p.m.
Created at: April 8, 2026, 9:49 p.m.