Triple
T12100311
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Electoral Act of Nigeria |
E288173
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Act of the National Assembly of Nigeria |
C30912
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Act of the National Assembly of Nigeria Context triple: [Electoral Act of Nigeria, instanceOf, Act of the National Assembly of Nigeria]
-
A.
Act of the Congress of the Philippines
An Act of the Congress of the Philippines is a formal written law or statute enacted by the Philippine legislature through its prescribed legislative process and, once approved and signed (or allowed to lapse into law), becomes part of the country’s legal framework.
-
B.
Act of Parliament of South Africa
An Act of Parliament of South Africa is a formal law enacted by the South African Parliament that establishes, amends, or repeals legal rules and frameworks within the country’s constitutional system.
-
C.
Act of the Oireachtas
An Act of the Oireachtas is a formal law enacted by Ireland’s national legislature, comprising the Dáil and Seanad, and signed by the President.
-
D.
Act of Congress
An Act of Congress is a formal law or statute enacted by the United States Congress and, typically upon receiving the President’s signature or a veto override, becomes legally binding federal legislation.
-
E.
Act of Parliament of India
An Act of Parliament of India is a formal written law enacted by the Indian Parliament through its legislative process, which becomes legally binding upon receiving presidential assent and publication.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4a5c448190a110d1273314b21a |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:48 p.m.