Triple

T12080356
Position Surface form Disambiguated ID Type / Status
Subject Lake Ellesmere / Te Waihora E287659 entity
Predicate hasManagementPlan P8851 FINISHED
Object Whakaora Te Waihora restoration programme
The Whakaora Te Waihora restoration programme is an environmental and cultural initiative focused on rehabilitating the ecological health and mauri (life force) of Te Waihora/Lake Ellesmere in partnership with local iwi and government agencies.
E963640 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Whakaora Te Waihora restoration programme | Statement: [Lake Ellesmere / Te Waihora, hasManagementPlan, Whakaora Te Waihora restoration programme]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Whakaora Te Waihora restoration programme
Context triple: [Lake Ellesmere / Te Waihora, hasManagementPlan, Whakaora Te Waihora restoration programme]
  • A. Mission Reach ecosystem restoration project
    The Mission Reach ecosystem restoration project is a large-scale environmental and recreational initiative that transformed an eight-mile stretch of the San Antonio River into a restored natural habitat with trails, native vegetation, and improved flood control.
  • B. Manukau Harbour Restoration Society
    The Manukau Harbour Restoration Society is a community-based advocacy group dedicated to protecting, restoring, and improving the environmental health and sustainable use of Auckland’s Manukau Harbour.
  • C. Waikato hydro scheme
    The Waikato hydro scheme is a series of hydroelectric power stations and dams on New Zealand’s Waikato River that form a major source of renewable electricity for the country.
  • D. Nag River Rejuvenation Project
    The Nag River Rejuvenation Project is an environmental infrastructure initiative aimed at cleaning, restoring, and sustainably managing the heavily polluted Nag River and its surrounding ecosystem.
  • E. Adyar River Restoration Project
    The Adyar River Restoration Project is an environmental initiative aimed at rehabilitating and rejuvenating the polluted Adyar River and its surrounding ecosystems in Chennai, India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Whakaora Te Waihora restoration programme
Triple: [Lake Ellesmere / Te Waihora, hasManagementPlan, Whakaora Te Waihora restoration programme]
Generated description
The Whakaora Te Waihora restoration programme is an environmental and cultural initiative focused on rehabilitating the ecological health and mauri (life force) of Te Waihora/Lake Ellesmere in partnership with local iwi and government agencies.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Whakaora Te Waihora restoration programme
Target entity description: The Whakaora Te Waihora restoration programme is an environmental and cultural initiative focused on rehabilitating the ecological health and mauri (life force) of Te Waihora/Lake Ellesmere in partnership with local iwi and government agencies.
  • A. Mission Reach ecosystem restoration project
    The Mission Reach ecosystem restoration project is a large-scale environmental and recreational initiative that transformed an eight-mile stretch of the San Antonio River into a restored natural habitat with trails, native vegetation, and improved flood control.
  • B. Manukau Harbour Restoration Society
    The Manukau Harbour Restoration Society is a community-based advocacy group dedicated to protecting, restoring, and improving the environmental health and sustainable use of Auckland’s Manukau Harbour.
  • C. Waikato hydro scheme
    The Waikato hydro scheme is a series of hydroelectric power stations and dams on New Zealand’s Waikato River that form a major source of renewable electricity for the country.
  • D. Nag River Rejuvenation Project
    The Nag River Rejuvenation Project is an environmental infrastructure initiative aimed at cleaning, restoring, and sustainably managing the heavily polluted Nag River and its surrounding ecosystem.
  • E. Adyar River Restoration Project
    The Adyar River Restoration Project is an environmental initiative aimed at rehabilitating and rejuvenating the polluted Adyar River and its surrounding ecosystems in Chennai, India.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4846e081908ee7bbd66a6d3459 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d904dc98a88190a5873f3fd8e1a0b2 completed April 10, 2026, 2:10 p.m.
NED1 Entity disambiguation (via context triple) batch_69f5f66301f081909697f9dd444a099e completed May 2, 2026, 1:04 p.m.
NEDg Description generation batch_69f5fde880f4819094b2170bf4e82138 completed May 2, 2026, 1:36 p.m.
NED2 Entity disambiguation (via description) batch_69f5ffc563a08190b95db768df475a3a completed May 2, 2026, 1:44 p.m.
Created at: April 8, 2026, 9:48 p.m.