Triple

T12076269
Position Surface form Disambiguated ID Type / Status
Subject Boadilla del Monte E287555 entity
Predicate roadConnection P385 FINISHED
Object M-501
M-501 is a major regional road in the Community of Madrid that connects Boadilla del Monte with other nearby municipalities and routes.
E968988 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M-501 | Statement: [Boadilla del Monte, roadConnection, M-501]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M-501
Context triple: [Boadilla del Monte, roadConnection, M-501]
  • A. M-50
    M-50 is a major orbital motorway around Madrid, Spain, designed to divert traffic from the city center and connect key suburbs and highways.
  • B. M-506
    M-506 is a regional road in the Community of Madrid, Spain, that serves as a key connector for the municipality of Pinto and surrounding areas.
  • C. M-5
    M-5 is a state highway in southeastern Michigan that serves as a key commuter route connecting Novi and surrounding suburbs to the Detroit metropolitan area.
  • D. M-55
    M-55 is a state trunkline highway in Michigan that runs east–west across the northern Lower Peninsula, connecting several communities including the city of Manistee.
  • E. M-115
    M-115 is a state trunkline highway in Michigan that serves as a regional connector route through the central and northwestern parts of the Lower Peninsula.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: M-501
Triple: [Boadilla del Monte, roadConnection, M-501]
Generated description
M-501 is a major regional road in the Community of Madrid that connects Boadilla del Monte with other nearby municipalities and routes.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: M-501
Target entity description: M-501 is a major regional road in the Community of Madrid that connects Boadilla del Monte with other nearby municipalities and routes.
  • A. M-50
    M-50 is a major orbital motorway around Madrid, Spain, designed to divert traffic from the city center and connect key suburbs and highways.
  • B. M-506
    M-506 is a regional road in the Community of Madrid, Spain, that serves as a key connector for the municipality of Pinto and surrounding areas.
  • C. M-5
    M-5 is a state highway in southeastern Michigan that serves as a key commuter route connecting Novi and surrounding suburbs to the Detroit metropolitan area.
  • D. M-55
    M-55 is a state trunkline highway in Michigan that runs east–west across the northern Lower Peninsula, connecting several communities including the city of Manistee.
  • E. M-115
    M-115 is a state trunkline highway in Michigan that serves as a regional connector route through the central and northwestern parts of the Lower Peninsula.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4846e081908ee7bbd66a6d3459 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d9045ceeec81909427cae8972eed26 completed April 10, 2026, 2:08 p.m.
NED1 Entity disambiguation (via context triple) batch_69f60a6b2d788190975275d713c26a4e completed May 2, 2026, 2:30 p.m.
NEDg Description generation batch_69f60bda16e48190af8abc0aa8ef41f0 completed May 2, 2026, 2:36 p.m.
NED2 Entity disambiguation (via description) batch_69f60cd1668881908f43d895fcfba0aa completed May 2, 2026, 2:40 p.m.
Created at: April 8, 2026, 9:48 p.m.