Triple

T12061840
Position Surface form Disambiguated ID Type / Status
Subject Kingston Gate E287191 entity
Predicate instanceOf P0 FINISHED
Object park gate C22800 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: park gate
Context triple: [Kingston Gate, instanceOf, park gate]
  • A. entrance gate chosen
    An entrance gate is a physical structure that marks and controls access to a property or area, often providing security, privacy, and a defined point of entry.
  • B. park section
    A park section is a distinct, designated area within a larger park that serves specific recreational, ecological, or functional purposes.
  • C. park feature
    A park feature is any designed or natural element within a park—such as paths, benches, playgrounds, gardens, or water bodies—that contributes to its use, aesthetics, or ecological value.
  • D. park system
    A park system is an organized network of public parks and green spaces managed collectively to provide recreation, conservation, and aesthetic benefits to a community or region.
  • E. parking garage
    A parking garage is a multi-level or enclosed structure designed to provide organized, secure, and efficient parking spaces for vehicles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4846e081908ee7bbd66a6d3459 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:48 p.m.