Triple
T12057167
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Public Law 95-87 |
E287070
|
entity |
| Predicate | alsoKnownAs |
P39
|
FINISHED |
| Object | SMCRA |
E287069
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SMCRA | Statement: [Public Law 95-87, alsoKnownAs, SMCRA]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: SMCRA Context triple: [Public Law 95-87, alsoKnownAs, SMCRA]
-
A.
SMCRA
chosen
SMCRA is a U.S. federal law that regulates the environmental effects of coal mining and requires the restoration of mined lands.
-
B.
SJRRC
SJRRC is a public agency in California that oversees and manages regional passenger rail services in the San Joaquin Valley area.
-
C.
Railinfratrust
Railinfratrust is the Dutch state-owned holding company that owns the national railway infrastructure and under which rail network manager ProRail operates.
-
D.
Conrail
Conrail was a major U.S. freight railroad formed in the 1970s to take over and revitalize the operations of several bankrupt Northeastern railroads.
-
E.
Surface Transportation Assistance Act of 1982
The Surface Transportation Assistance Act of 1982 is a major U.S. federal law that overhauled highway and transit funding by raising fuel taxes and dedicating new revenues to both road infrastructure and public transportation.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4780948190bdb9f7620c2ac27e |
completed | April 8, 2026, 7:23 p.m. |
| NER | Named-entity recognition | batch_69d9043bf0ec8190a51ef2641808320c |
completed | April 10, 2026, 2:07 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f5f64f40388190bfb3d2a81d5fbf5e |
completed | May 2, 2026, 1:04 p.m. |
Created at: April 8, 2026, 9:47 p.m.