Triple
T12056537
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Wilderness lagoons |
E287056
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | estuarine wetland |
C80
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: estuarine wetland Context triple: [Wilderness lagoons, instanceOf, estuarine wetland]
-
A.
estuary
chosen
An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
-
B.
wetland
A wetland is a transitional ecosystem between terrestrial and aquatic environments characterized by saturated soils, standing or slow-moving water, and vegetation adapted to waterlogged conditions.
-
C.
tidal creek
A tidal creek is a narrow, shallow waterway in coastal or estuarine areas whose flow and water level are strongly influenced by the rise and fall of the tides.
-
D.
National Estuary Program
The National Estuary Program is a U.S. Environmental Protection Agency initiative that protects and restores nationally significant estuaries through collaborative, community-based watershed planning and management.
-
E.
restored wetland
A restored wetland is a previously degraded or altered wetland area that has been intentionally rehabilitated to recover its natural hydrology, vegetation, and ecological functions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4780948190bdb9f7620c2ac27e |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:47 p.m.