Triple

T12050637
Position Surface form Disambiguated ID Type / Status
Subject West Ham Underground station E286905 entity
Predicate instanceOf P0 FINISHED
Object DLR station C30361 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: DLR station
Context triple: [West Ham Underground station, instanceOf, DLR station]
  • A. ESA facility
    An ESA facility is a specialized location, infrastructure, or installation operated or supported by the European Space Agency to conduct space-related research, development, testing, mission operations, or support services.
  • B. Munich U-Bahn station
    A Munich U-Bahn station is an underground or surface-level transit facility in Munich’s rapid transit network where passengers access, board, and transfer between U-Bahn trains.
  • C. NASA center
    A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
  • D. NASA spaceport
    A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
  • E. Hamburg U-Bahn station
    A Hamburg U-Bahn station is a designated stop or terminal along Hamburg’s urban rapid transit network, providing platforms, access facilities, and passenger services for boarding and alighting U-Bahn trains.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4780948190bdb9f7620c2ac27e completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:47 p.m.