Triple

T12050205
Position Surface form Disambiguated ID Type / Status
Subject Line 4–Yellow E286895 entity
Predicate instanceOf P0 FINISHED
Object driverless metro line C13192 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: driverless metro line
Context triple: [Line 4–Yellow, instanceOf, driverless metro line]
  • A. automated guideway transit line chosen
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • B. streetcar system
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • C. metro train
    A metro train is an electrically powered, multi-car rail vehicle designed to transport large numbers of passengers quickly and frequently along dedicated urban and suburban transit lines.
  • D. monorail transit line
    A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
  • E. monorail line
    A monorail line is a guided transit route where trains run on a single rail or beam, typically elevated, providing efficient and often automated urban or interurban transportation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab4780948190bdb9f7620c2ac27e completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:47 p.m.