Triple
T12032430
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Global Distribution Systems |
E286444
|
entity |
| Predicate | hasMajorExample |
P58835
|
FINISHED |
| Object | Sabre |
E184467
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sabre | Statement: [Global Distribution Systems, hasMajorExample, Sabre]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Sabre Context triple: [Global Distribution Systems, hasMajorExample, Sabre]
-
A.
Sabre
chosen
Sabre is a leading global travel technology company that provides software and distribution solutions for airlines, hotels, and travel agencies.
-
B.
Sabre Holdings
Sabre Holdings is a major travel technology and global distribution systems company that provides software and services to airlines, hotels, and travel agencies worldwide.
-
C.
Mariot
Mariot is a given name most notably borne by the 18th-century British Royal Navy officer Mariot Arbuthnot.
-
D.
CAC Sabre
The CAC Sabre was an Australian-built, Rolls-Royce Avon–powered development of the F-86 Sabre fighter jet, adapted and produced by the Commonwealth Aircraft Corporation for service with the Royal Australian Air Force.
-
E.
Ebasco
Ebasco was a major American engineering and construction firm known for designing and building large-scale power plants, including nuclear facilities worldwide.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4669e48190b59246358b0383ab |
completed | April 8, 2026, 7:23 p.m. |
| NER | Named-entity recognition | batch_69d915124e4c8190b0264c2a09e3c2f3 |
completed | April 10, 2026, 3:19 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69f49d6ec4b8819093ff50254a851444 |
completed | May 1, 2026, 12:32 p.m. |
Created at: April 8, 2026, 9:47 p.m.