Triple
T12024997
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Robin Hood Gate |
E286252
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | access gate |
C22800
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: access gate Context triple: [Robin Hood Gate, instanceOf, access gate]
-
A.
access control system
An access control system is a coordinated set of hardware, software, and policies that regulates and monitors who or what can enter, use, or interact with physical or digital resources based on defined permissions.
-
B.
entrance gate
chosen
An entrance gate is a physical structure that marks and controls access to a property or area, often providing security, privacy, and a defined point of entry.
-
C.
entrance
An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
-
D.
contactless access system
A contactless access system is a security solution that grants or denies entry to users through non-physical interaction methods such as RFID cards, mobile credentials, or biometrics, enhancing convenience and hygiene while maintaining controlled access.
-
E.
access control systems provider
An access control systems provider is a company that designs, supplies, installs, and maintains electronic and physical security solutions that regulate and monitor who can enter or use specific locations, resources, or information.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab4669e48190b59246358b0383ab |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:47 p.m.