Triple

T11978050
Position Surface form Disambiguated ID Type / Status
Subject PID Controllers: Theory, Design, and Tuning E285085 entity
Predicate instanceOf P0 FINISHED
Object engineering book C1448 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering book
Context triple: [PID Controllers: Theory, Design, and Tuning, instanceOf, engineering book]
  • A. engineering handbook
    An engineering handbook is a comprehensive reference guide that compiles essential principles, formulas, standards, and best practices across engineering disciplines for practical problem-solving and design.
  • B. engineering journal
    An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
  • C. engineering library
    An engineering library is a specialized collection of technical resources, including books, journals, standards, and digital tools, that support research, education, and practice in engineering disciplines.
  • D. technical book chosen
    A technical book is a structured, in-depth written work that explains specialized concepts, methods, or technologies in a specific field, often combining theory with practical examples and applications.
  • E. engineering standard
    An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2eaeb881909f7914758f859413 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:46 p.m.