Triple
T11975792
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Falmouth Docks |
E285036
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ship repair facility |
C13901
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ship repair facility Context triple: [Falmouth Docks, instanceOf, ship repair facility]
-
A.
shipbuilding facility
A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
-
B.
shipbuilder
A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
-
C.
naval victualling yard
A naval victualling yard is a specialized dockyard facility where food, drink, and other provisions are stored, processed, and supplied to naval ships and personnel.
-
D.
dry dock
chosen
A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
-
E.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2eaeb881909f7914758f859413 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:46 p.m.