Triple

T11962721
Position Surface form Disambiguated ID Type / Status
Subject Dirección de Transporte Público Metropolitano E284707 entity
Predicate instanceOf P0 FINISHED
Object autoridad de transporte público C220 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: autoridad de transporte público
Context triple: [Dirección de Transporte Público Metropolitano, instanceOf, autoridad de transporte público]
  • A. public transportation agency chosen
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • B. mass transit operator
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • C. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • D. transit agency board
    A transit agency board is a governing body that sets policy, oversees funding and strategic direction, and provides public accountability for a region’s public transportation system.
  • E. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2eaeb881909f7914758f859413 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:45 p.m.