Triple
T11952326
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Stingray City sandbar |
E284455
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | wildlife interaction site |
C19180
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: wildlife interaction site Context triple: [Stingray City sandbar, instanceOf, wildlife interaction site]
-
A.
wildlife viewing area
chosen
A wildlife viewing area is a designated location where people can safely observe animals in their natural or semi-natural habitats with minimal disturbance.
-
B.
wildlife habitat
A wildlife habitat is a natural or modified environment that provides the food, water, shelter, and space necessary for wild animals and plants to live, grow, and reproduce.
-
C.
wildlife refuge
A wildlife refuge is a protected area of land or water managed to conserve native plants, animals, and their habitats while limiting or regulating human activities.
-
D.
wildlife lake
A wildlife lake is a natural or man-made body of water designed or preserved to support diverse wild animal and plant species in and around its aquatic ecosystem.
-
E.
wildlife population
A wildlife population is a group of individuals of the same species living in a defined geographic area that interact, reproduce, and are studied collectively in terms of their size, structure, and dynamics.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2db38c8190b1f0ed6663ef8ada |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:45 p.m.