Triple

T11949258
Position Surface form Disambiguated ID Type / Status
Subject Bradford City stadium fire E284385 entity
Predicate standConstruction P38699 FINISHED
Object wooden stand LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: wooden stand | Statement: [Bradford City stadium fire, standConstruction, wooden stand]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: standConstruction
Context triple: [Bradford City stadium fire, standConstruction, wooden stand]
  • A. mainConstructionPhaseUnder
    Indicates that one construction phase occurs under or is subordinate to another primary construction phase in a project’s timeline or hierarchy.
  • B. laterConstruction
    Indicates that one construction event or structure occurred or was built after another in time.
  • C. hasConstruction chosen
    Indicates that one entity possesses, contains, or is characterized by a particular construction, structure, or built form associated with it.
  • D. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • E. constructionDirection
    Indicates the orientation or path along which a structure is built or assembled.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2db38c8190b1f0ed6663ef8ada completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d90346825c8190ab4482a1fc8eed56 completed April 10, 2026, 2:03 p.m.
PD Predicate disambiguation batch_69d8bb3e48e08190b2fee43af4f57323 completed April 10, 2026, 8:56 a.m.
Created at: April 8, 2026, 9:45 p.m.