Triple
T11947521
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gilboa Dam |
E284339
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | earthen embankment dam |
C11364
|
CONCEPT FINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: earthen embankment dam Context triple: [Gilboa Dam, instanceOf, earthen embankment dam]
-
A.
embankment dam
An embankment dam is a large artificial barrier constructed from compacted earth or rock materials to hold back water and create a reservoir.
-
B.
earthfill dam
chosen
An earthfill dam is a large embankment structure made primarily of compacted earth materials, designed to impound water by using its mass and low permeability to resist and control reservoir pressures.
-
C.
concrete dam
A concrete dam is a massive engineered barrier constructed primarily from concrete to hold back and control the flow of water in a river or reservoir.
-
D.
concrete gravity dam
A concrete gravity dam is a massive structure made of concrete that resists the horizontal thrust of water primarily through its own weight and the force of gravity.
-
E.
reservoir dam
A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
- F. None of above.
Provenance (1 batch)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69d6ab2db38c8190b1f0ed6663ef8ada |
elicitation | completed |
Created at: April 8, 2026, 9:45 p.m.