Triple

T11941476
Position Surface form Disambiguated ID Type / Status
Subject Montreuil studio of Georges Méliès E284187 entity
Predicate instanceOf P0 FINISHED
Object early purpose-built film studio C2563 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: early purpose-built film studio
Context triple: [Montreuil studio of Georges Méliès, instanceOf, early purpose-built film studio]
  • A. movie studio backlot
    A movie studio backlot is a controlled outdoor area on a studio's property containing permanent or semi-permanent sets and streetscapes used to film a wide variety of scenes without leaving the studio.
  • B. television studio complex
    A television studio complex is a purpose-built facility that houses multiple studios, control rooms, production offices, technical infrastructure, and support spaces for creating, recording, and broadcasting television content.
  • C. film studio chosen
    A film studio is a company or facility that finances, produces, and often distributes motion pictures and related media content.
  • D. film sound stage
    A film sound stage is a large, acoustically controlled studio space designed for constructing sets and recording synchronized picture and sound for film and television productions.
  • E. major film studio
    A major film studio is a large, well-funded entertainment company that develops, finances, produces, markets, and distributes films (and often related media) on a national or global scale.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2db38c8190b1f0ed6663ef8ada completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:45 p.m.