Triple
T11936050
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Obey Giant |
E284049
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | street art campaign |
C7010
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: street art campaign Context triple: [Obey Giant, instanceOf, street art campaign]
-
A.
protest art
Protest art is creative expression—across mediums like murals, posters, performance, and digital media—intentionally designed to challenge power structures, raise political or social awareness, and inspire collective action.
-
B.
muralism
Muralism is an artistic movement focused on creating large-scale paintings directly on walls or public surfaces, often conveying social, political, or cultural messages to a broad audience.
-
C.
graffiti tag
A graffiti tag is a stylized, often quickly executed signature or symbol used by a writer to mark presence or claim territory in public spaces.
-
D.
mural series
A mural series is a cohesive collection of large-scale wall artworks, created across multiple surfaces or locations, that share a unifying theme, style, or narrative.
-
E.
public campaign
chosen
A public campaign is a coordinated set of communication and outreach activities designed to inform, persuade, or mobilize a broad audience around a specific social, political, or commercial issue.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2ce9c48190b5d39511b524f666 |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:45 p.m.