Triple

T11935738
Position Surface form Disambiguated ID Type / Status
Subject Morton, Illinois E284037 entity
Predicate transportation P230 FINISHED
Object Interstate 155 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 155 | Statement: [Morton, Illinois, transportation, Interstate 155]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 155
Context triple: [Morton, Illinois, transportation, Interstate 155]
  • A. Interstate 155 chosen
    Interstate 155 is a short auxiliary Interstate highway in Illinois that connects Interstate 55 with Interstate 74, serving as a regional link in the central part of the state.
  • B. Interstate 185
    Interstate 185 is a short auxiliary Interstate Highway in South Carolina that serves as a connector route in the Greenville metropolitan area.
  • C. Interstate 185
    Interstate 185 is a spur route of Interstate 85 in western Georgia that connects the Columbus area to the main interstate network.
  • D. Interstate 196
    Interstate 196 is a spur of Interstate 96 in western Michigan that connects Grand Rapids to the Lake Michigan shoreline, serving cities such as Holland and South Haven.
  • E. Interstate 184
    Interstate 184 is a short auxiliary Interstate Highway in Boise, Idaho, serving as a spur that connects downtown Boise with Interstate 84.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2ce9c48190b5d39511b524f666 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d90306fcf48190a963d2d1932288d1 completed April 10, 2026, 2:02 p.m.
Created at: April 8, 2026, 9:45 p.m.