Triple

T11925889
Position Surface form Disambiguated ID Type / Status
Subject Weld County, Colorado E283780 entity
Predicate transportationCorridor P385 FINISHED
Object Interstate 25 E46976 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 25 | Statement: [Weld County, Colorado, transportationCorridor, Interstate 25]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 25
Context triple: [Weld County, Colorado, transportationCorridor, Interstate 25]
  • A. Interstate 25 chosen
    Interstate 25 is a major north–south U.S. highway running through the Rocky Mountain region, connecting cities from New Mexico through Colorado to Wyoming.
  • B. Interstate 70
    Interstate 70 is a major east–west U.S. highway that stretches from Utah to Maryland, serving as a key transportation corridor across the central United States.
  • C. Interstate 17
    Interstate 17 is a primary north–south freeway in Arizona that connects Phoenix with Flagstaff and serves as a key route to northern Arizona destinations.
  • D. Interstate 15
    Interstate 15 is a major north–south U.S. highway running from Southern California through the Intermountain West to the Canadian border, serving key cities such as Las Vegas and Salt Lake City.
  • E. Interstate 27
    Interstate 27 is a north–south U.S. Interstate Highway in Texas that connects the cities of Lubbock and Amarillo, serving as a key corridor through the Texas Panhandle and South Plains.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2ce9c48190b5d39511b524f666 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8e8e3ff308190851ce656286bc67e completed April 10, 2026, 12:11 p.m.
NED1 Entity disambiguation (via context triple) batch_69f64b7e6f0c8190b9df17f969df0deb completed May 2, 2026, 7:07 p.m.
Created at: April 8, 2026, 9:45 p.m.