Triple

T11920030
Position Surface form Disambiguated ID Type / Status
Subject Hinkley Point A nuclear power station E283628 entity
Predicate reactorNetCapacity_MWe P35295 FINISHED
Object 235 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 235 | Statement: [Hinkley Point A nuclear power station, reactorNetCapacity_MWe, 235]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: reactorNetCapacity_MWe
Context triple: [Hinkley Point A nuclear power station, reactorNetCapacity_MWe, 235]
  • A. netElectricalCapacity_MWe chosen
    Indicates the relationship specifying an entity’s net electrical power generation capacity, measured in megawatts electric (MWe), after accounting for internal power consumption.
  • B. totalElectricalCapacity_MWe
    Indicates the total electrical power generation capacity, measured in megawatts electric (MWe), that an entity can produce or supply.
  • C. grossElectricalCapacity_MWe
    Indicates the total electrical power output capacity of a generating unit, measured in megawatts electric (MWe), before accounting for internal power consumption or losses.
  • D. thermalCapacityPerReactor_MWth
    Indicates the amount of thermal power capacity, measured in megawatts thermal (MWth), associated with each individual reactor.
  • E. turbineCapacity
    Indicates the power-generating capacity or rated output of a turbine.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2c07e88190ba13b0d21fd6cf33 completed April 8, 2026, 7:23 p.m.
NER Named-entity recognition batch_69d8e8dff77481908cacf6ad03df34ac completed April 10, 2026, 12:11 p.m.
PD Predicate disambiguation batch_69d8bb3632ac8190b13e53c2b5db7125 completed April 10, 2026, 8:56 a.m.
Created at: April 8, 2026, 9:44 p.m.