Triple
T11894801
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 1992 Stock |
E283008
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | deep-level tube stock |
C30576
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: deep-level tube stock Context triple: [1992 Stock, instanceOf, deep-level tube stock]
-
A.
steel
Steel is a strong, durable alloy primarily composed of iron and carbon, widely used in construction, manufacturing, and tools due to its high tensile strength and versatility.
-
B.
integrated steel mill
An integrated steel mill is a large industrial complex that converts raw materials like iron ore, coal, and limestone into finished steel products through a continuous, vertically integrated process including coke making, ironmaking, steelmaking, and rolling.
-
C.
rail tunnel
A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
-
D.
freight rail trench
A freight rail trench is a sunken, often open-air corridor designed to carry freight trains below street level to reduce surface congestion, noise, and conflicts with other transportation modes.
-
E.
road tunnel
A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2a90b08190a4e818821cc93e6d |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:44 p.m.