Triple
T11884839
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Highway 1A (Vietnam) |
E282751
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road in Vietnam |
C30549
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road in Vietnam Context triple: [National Highway 1A (Vietnam), instanceOf, road in Vietnam]
-
A.
road in Hanoi
A road in Hanoi is a public transportation corridor within the city’s dense urban fabric, accommodating mixed traffic flows of motorbikes, cars, buses, and pedestrians while connecting residential, commercial, and cultural areas.
-
B.
road in Japan
A road in Japan is a public or private paved or unpaved route designed for vehicular and pedestrian travel, characterized by Japan-specific regulations, signage, and infrastructure standards.
-
C.
road in Virginia
A road in Virginia is a designated vehicular travelway within the Commonwealth of Virginia that facilitates transportation, access, and connectivity between locations while adhering to state and local regulations and infrastructure standards.
-
D.
bridge in Vietnam
A bridge in Vietnam is a structural crossing—ranging from historic colonial-era spans to modern cable-stayed icons—that connects regions over rivers, deltas, or urban waterways, supporting transportation, trade, and tourism within the country’s diverse landscapes.
-
E.
road in South Africa
A road in South Africa is a constructed transportation route, ranging from national highways to local streets, designed to support vehicular and pedestrian movement while adhering to the country’s specific traffic laws, signage standards, and infrastructural conditions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2a90b08190a4e818821cc93e6d |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:44 p.m.