Triple
T11881430
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Neptune Fountain (Schönbrunn) |
E282666
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | garden sculpture ensemble |
C9178
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: garden sculpture ensemble Context triple: [Neptune Fountain (Schönbrunn), instanceOf, garden sculpture ensemble]
-
A.
sculpture group
chosen
A sculpture group is a three-dimensional artwork composed of multiple figures or elements arranged together to form a unified visual and thematic composition.
-
B.
sculpture park
A sculpture park is an outdoor space where a curated collection of sculptures is displayed within a landscaped or natural environment for public enjoyment and cultural enrichment.
-
C.
topiary sculpture
A topiary sculpture is a three-dimensional ornamental form created by carefully trimming and training living plants into specific shapes or figures.
-
D.
garden feature
A garden feature is a designed element within an outdoor space—such as a pond, statue, path, or seating area—intended to enhance its visual appeal, structure, or functionality.
-
E.
public sculpture
A public sculpture is a three-dimensional artwork installed in outdoor or communal spaces, intended for public viewing and interaction, often reflecting cultural, historical, or social themes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d6ab2a90b08190a4e818821cc93e6d |
completed | April 8, 2026, 7:23 p.m. |
Created at: April 8, 2026, 9:44 p.m.