Triple

T11876922
Position Surface form Disambiguated ID Type / Status
Subject うめだスカイビル E282551 entity
Predicate instanceOf P0 FINISHED
Object 複合施設 C12924 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 複合施設
Context triple: [うめだスカイビル, instanceOf, 複合施設]
  • A. multi-purpose facility chosen
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • B. civic building complex
    A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
  • C. commercial and residential complex
    A commercial and residential complex is a mixed-use development that integrates living spaces with retail, office, and service facilities within a unified property or group of buildings.
  • D. mixed-use skyscraper complex
    A mixed-use skyscraper complex is a vertically integrated high-rise development that combines residential, commercial, office, and often recreational or civic functions within a unified architectural and infrastructural framework.
  • E. institutional building complex
    An institutional building complex is a coordinated group of structures and shared spaces designed to support the functions, services, and administration of an organization such as a university, hospital, or government entity.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d6ab2945d081908a5851c916cbcfb5 completed April 8, 2026, 7:23 p.m.
Created at: April 8, 2026, 9:44 p.m.